In a snap decision to extend one of their existing production lines, our team of conveying engineers attended site at Hitchen  Foods during shift changeover, and had 6 hours to install the extension of the modular belt conveyor to the mash potato line.  Work began at 7pm and completed within the time frame for 1am! for the morning shift to resume production.

Conveyors where manufactured off site within a two day time frame prior to installation.